<

欧美日韩在线精品一区二区三区激情综合,欧美日韩成人精品久久久免费看,欧美日韩国产中文精品字幕自在自线,欧美日韩激情无码专区,欧美日韩精品一区二区三区不卡,亚洲精品国产日韩无码AV永久免费网,欧美一级毛片在播放免费一区二区狠狠色丁香久久婷婷,亚洲狠狠婷婷综合久久久久图片,久久大香伊蕉在人线,狠狠色伊人久久精品综合网,篠田优,近親相姦中出し親子在线,久久久无码国产精品免费,日本精品久久久久久久影视,欧美日韩视频在线观看,推特网红冯珊珊公园任务,亚洲精品无码理论片,久久精品国产尤物奈,亚洲国产精品偷窥,欧美日韩国产色综合一二三四,欧美日韩亚洲综合一区二区三区激情在线,国产伦码精品一区二区

SZ CnAuto automation equipment Co., Ltd.

Specializing in the production of automatic\precision\high speed dispenser manufacturers

Hot Tel:

18929475867

Contact

TEL:

18929475867

深圳中制自動化設(shè)備有限公司

Email:jerry@prcrobot.net

QQ:a :

ADD:東莞市塘廈鎮(zhèn)石潭浦大逕路62號

Information on Choosing to Use Piston Pressure Barrel

作者:馬交易???日期:2019-09-06 20:15???瀏覽:

Piston pressure barrel is mainly used to transport high viscosity, fluidity of liquid materials.
 
There are three holes in the barrel cover, one ball valve (for deflation), one safety valve (when the pressure exceeds the safe range, it will automatically deflate to ensure safety), one pressure regulating valve (with air intake at the top and pressure gauge at the top); two quick joints are connected with the ball valve at the bottom, one is the exhaust port, the other is the trachea joint, and the trachea will direct the piston. Push up.
活塞式點膠桶  
 
 
Assembly and use
 
壓力桶 Close the two ball valves at the bottom, take out the piston and pour the glue into the barrel. When putting into the piston, keep a certain distance from the glue. Close the lid and close the top ball valve. Connect the material pipe to the quick discharge joint at the bottom (marked "8" above, usually the outer diameter of the material pipe is 8 mm, and the outer diameter of the trachea is 6 mm). Put the other part of the material pipe. A section is connected to the dispensing valve, the ball valve at the discharge position is opened, and then the glue can be conveyed by the piston pressure bucket by adjusting the pressure regulating valve at the top intake (the air pressure is large enough to convey glue normally).
 
 
 
 
When the glue is used up, close the ball valve at the discharge position, pull out the top pipe and insert it into the joint position of the bottom pipe (another pipe can also be arranged and inserted directly into the joint position), open the top ball valve (note: the lid is not opened at this time), open the channel of the connecting bottom force to establish the joint position of the pipe. The piston is pushed to the top to remove the pipe and open the lid. The piston is removed and loaded again.
 
In the process of pushing the piston, pay attention to the closure of the cover of the piston pressure barrel and ensure safety.