<

欧美日韩在线精品一区二区三区激情综合,欧美日韩成人精品久久久免费看,欧美日韩国产中文精品字幕自在自线,欧美日韩激情无码专区,欧美日韩精品一区二区三区不卡,亚洲精品国产日韩无码AV永久免费网,欧美一级毛片在播放免费一区二区狠狠色丁香久久婷婷,亚洲狠狠婷婷综合久久久久图片,久久大香伊蕉在人线,狠狠色伊人久久精品综合网,篠田优,近親相姦中出し親子在线,久久久无码国产精品免费,日本精品久久久久久久影视,欧美日韩视频在线观看,推特网红冯珊珊公园任务,亚洲精品无码理论片,久久精品国产尤物奈,亚洲国产精品偷窥,欧美日韩国产色综合一二三四,欧美日韩亚洲综合一区二区三区激情在线,国产伦码精品一区二区

SZ CnAuto automation equipment Co., Ltd.

Specializing in the production of automatic\precision\high speed dispenser manufacturers

Hot Tel:

18929475867

Tell you the correct way to connect the dispensing pressure

作者:馬交易???日期:2019-09-09 17:06???瀏覽:

Industrial pressure barrel connection is used, especially not for food use. Industrial pressure barrel connection, this problem is not complicated, you only need 10 minutes to learn.
 
壓力桶
Joining steps of industrial pressure barrel
 
Listen to the little editor let you out:
壓力桶
Step 1: Assemble the components of pressure gauge and exhaust valve and install them in the designated position of the cover.
 
Step 2: Pass the feeding pipe through the feeding nozzle, and then install the feeding nozzle at the finger position of the cylinder cover.
 
Step 3: Press the sealing ring into the groove of the drum cover.
 
不銹鋼壓力桶 Step 4: Twist the relief valve into the position of the bucket cover.
 
How to Connect Industrial Pressure Barrels
 
Pressure barrel connection is completed. Do you have less than 10 minutes of learning experience? Medium-sized automation professional customized industrial pressure barrel, accepting customized processing, welcome to inquire.